+7 (342) 2-700-799

Mon -Fr 6:00 AM - 6:00 PM (GMT+3 )

Ru En

GALILEOSKY BASE BLOCK added to comparison

Product has been added to cart

Take part in a free Galileosky webinar

Solutions

Special services

Оptimization of service groups operation

A simultaneous control of several terminals, sending data to two servers at the same time allow to carry out an effective monitoring of routes made by vehicles and service groups, duration of stops.

Due to constant real-time connection with the server you can see the location of a vehicle on the map.

Support of several SIM-cards of different service providers and an opportunity to install a SIM-chip allow to carry out monitoring in any place of the world and to save costs on cellular communication. 

Improvement of effective car fleet use

Eco Drive function allows to determine and improve the driving style, in order to decrease expenses on fuel and vehicle inspection.

Connection of up to 16 fuel level sensors allows to control fuel consumption and observe fuel discharge.
Detailed track drawing without extra points on a straight road provides accurate data transmission and allows to decrease expenses on data transmission traffic.

Control of service groups operation

Identification of drivers with the help of iButton and RFID-readers and connection of a tachograph allow to control schedule of drivers’ work and rest.

Connection of a push-to-talk or 2-way voice communication allows to get in touch with dispatchers, and an opportunity to connect an alarm button provides a quick reaction to accidents.

Ease of use

A broad range of integrated software and additional devices, remote setting via SMS, GPRS, USB allow to assess all advantages of operation with professional equipment.
Thanks to CAN-interface you can get data on engine operating time, mileage, fuel consumption from the moment of car production, engine speed, vehicle speed and other parameters thanks to which you can optimize performance of equipment.

Choose industry solutions type

Send a request for project cost calculations